Wastewater Treatment
For decades, we have been building Waste Water Treatment Facilities while self-performing the majority of the work scopes of the projects. Our self-performance capability in various disciplines enhances our ability to manage and control project costs, schedule and construction quality.
Waste Water Treatment Facilities construction and rehabilitation is one of our core services at 3D. One factor that illustrates project size is the contract price. It is equally important to consider one’s experience in dealing with large volume flows, large basin construction, phasing of construction, complex electrical, instrumentation and process equipment systems and architecturally complex buildings.

These Waste Water Treatment Facilities’ construction required pipelines as large as 84 inches in diameter – big enough for some of the tallest NBA basketball players to walk through, storage tanks with 20 million gallons of capacity, in-ground water basins larger than the size of football fields. Many of the administrative buildings at these plants were over 10,000 square feet of floor space. Chemical facilities at these plants have exceeded 10,000 square feet under roof. Pumps with over 2000 horsepower drive the flows in some of these Facilities. At least one of the plants is designed with instrumentation and controls to allow unmanned operation.
3D’s people have designed, installed and operated 24/7 pump-around systems with flow capacities as large as 30 million gallons per day with redundancy. Some of these pump-around systems were operated for months.
Featured Projects
Customer Letter of Satisfaction [ click PDF ]
We look forward to having the opportunity to work with you. Contact us for additional information.